Calculations of the stress-strain state of the conjugation of the concrete and rock-fill dams of the Boguchanskaya HPP
https://doi.org/10.26897/1997-6011-2024-1-49-56
Abstract
The conjugation interface of the concrete dam with the rock-fill dam is the most critical section of the pressure front of the Boguchanskaya HPP. The most important feature of the Boguchanskaya HPP is the presence of an impervious element – an asphalt concrete diaphragm, which is made using a special technology from a cast hydraulic asphalt concrete mixture laid in a heated state. The safety of the pressure front of the hydroelectric complex depends on the condition of the junction of the asphalt concrete diaphragm with section No. 34 of the concrete dam (including the condition of the contact joint between them). After the beginning of filling the reservoir in 2012, the opening of the contact joint between the ABD and section No. 34 of the concrete dam was recorded, and the settlement of the ABD relative to section No. 34 of the concrete dam was also noted. At present, the opening of the contact seam and the settlement cannot be called stabilized. The aim of the research is to determine the computational stress-strain state of the conjugation between the concrete and rock-fill dams of the Boguchanskaya HPP. On the basis of a spatial finite element model of the conjunction of a concrete dam with a rock-fill dam, taking into account the data of field observations and deviations from the design prerequisites, calculations of the stress-strain state were performed. The results of the calculations showed that the controlled values do not exceed the criterion values.
About the Authors
E. N. BellendirRussian Federation
Evgeniy N. Bellendir, Doctor of Technical Sciences, General director
AuthorID: 272223
125080, Moscow, Volokolamskoye shosse, 2
O. D. Rubin
Russian Federation
Oleg D. Rubin, Doctor of Technical Sciences, Director of the branch, Professor
AuthorID: 423001, Scopus: 7004427140, Researcher ID: AAE-6688-2022
125080, Moscow, Volokolamskoye shosse, 2
129337, Moscow, Yaroslavskoye shosse, 26
S. V. Yuriev
Russian Federation
Sergey V. Yuriev, Engineer, Deputy Chief Engineer for main structures
125080, Moscow, Volokolamskoye shosse, 2
S. E. Lisichkin
Russian Federation
Sergey E. Lisichkin, doctor of technical science, chief specialist of the branch
AuthorID: 368472, Scopus: 6603919071
125080, Moscow, Volokolamskoye shosse, 2
I. V. Baklykov
Russian Federation
Igor V. Baklykov, Engineer, Leading Specialist of the branch
AuthorID: 915462, Scopus: 56538614100
125080, Moscow, Volokolamskoye shosse, 2
References
1. Clarification of technical solutions of the project of the Boguchanskaya HPP with the NPU of the reservoir of 208.0 m. Moscow: OAO “Institute Hydroproject”, 2008.
2. Boguchanskaya Hydroelectric Power Plant on the Angara River. Clarification of the technical solutions of the project with a 208.0 m NPU due to a change in the electrical connection scheme at 220 kV and 500 kV as part of the generating facility of the Boguchanskaya HPP. T/ 1-2. Moscow: Institute Hydroproject, 2010.
3. Sainov M.P.; Poslykhalin Y.A. Asphaltic Concrete Cores of Embankment Dams: a Review; 2021; AlfaBuild; Volume 18 Article No 1801. doi: 10.34910/ALF.18.1
4. Dymant A.N. Features of the performance of cast asphalt concrete diaphragms of ground dams at low temperatures / Kasatkin Yu.N., Kuznetsov E.I., Uspenskiy V.V. // Izvestiya of VNIIG named after B.E. Vedeneev. 2009. V. 254. P. 59-65.
5. Dymant A.N., Kuznetsov E.I., Prokopovich V.S. Cast asphalt concrete diaphragms of ground dams. // Hydraulic engineering construction. 2011. № 9. P. 47-54.
6. Dymant A.N., Kuznetsov E.I., Prokopovich V.S. Experience in the construction of a cast asphalt concrete diaphragm of the stone-fill dam of the Boguchanskaya hydroelectric power plant // Hydrotechnics of the XXI century. 2012. № 5 (12). P. 20-25.
7. Feng S., Wang W., Hu, W., Deng Y., Yang J., Wu, S., Zhang C., Höeg K. Design and performance of the Quxue asphalt-core rockfill dam. Soils and Foundations. 2020. 60(4). Pp. 1036-1049. DOI: 10.1016/j.sandf.2020.06.008.
8. Uspenskii V.V., Kuznetsov E.I. Analysis and prediction of asphalt-concrete core wall settlement of the Boguchany HPP rockfill dam during the period of construction completion. Power Technology and Engineering. 2017. 50(5). Pp. 501-505. DOI: 10.1007/s10749-017-0739-6.
9. Wang Z., Hao J., Yang J., Cao Y., Li, X., Liu S. Experimental study on hydraulic fracturingof high asphalt concrete core rock-fill dam. Applied Sciences (Switzerland). 2019. 9(11), P. 1-17. DOI: 10.3390/app9112285.
10. Gao J., Dang F., Ma, Z. ScienceDirect Investigation for the key technologies of ultra-high asphalt concrete core rockfill dams. Soils and Foundations. 2019. 59(6). P. 1740-1757.DOI: 10.1016/j.sandf.2019.07.013. URL: https://doi.org/10.1016/j.sandf.2019.07.013.
11. Gao J., Dang F., Ma, Z., Xue Y., Ren J. Improvement Methods for Reduction of the High Stress of Ultra-High Asphalt Concrete Core Dams. Oct. 2019. Applied sciences 9(21):4618. DOI: 10.3390/app9214618.
12. Volynchikov A.N., Gaziev E.G. Behavior of the concrete and rock-fill dams of the Boguchanskaya hydroelectric power plant during the period of filling the reservoir (2012-2015) // Hydrotechnical construction. 2015. № 12. P. 13-23.
13. Baklykov I.V. Analysis of the behavior of the conjugation of concrete and rock-fill dams of the Boguchanskaya Hydroelectric Power Plant in the period of filling // Proceedings of the All-Russian scientific research institute of hydraulic engineering named after B.E. Vedeneev. 2014. № 273. P. 84-95.