Development of priority measures to increase the capacity of the hydraulic reclamation system, produced before the implementation of major repairs or reconstruction
https://doi.org/10.26897/1997-6011-2025-3-85-92
Abstract
Methods for protecting hydraulic structures and maintaining conditions for their trouble-free operation have currently been developed in sufficient detail and are widely used. The question is one of appropriateness, consistency, intensity and place of their application. In the context of a shortage of financial resources allocated for the restoration of hydromelioration systems, it makes sense to conduct an analysis of the distribution of costs for restoring the operability of hydromelioration systems in accordance with the Pareto Law. The Pareto law in its most general form is formulated as “20% of the effort gives 80% of the result, and the remaining 80% of the effort gives only 20% of the result.” In our case, as applied to linear structures, this means eliminating individual faults that have the most significant impact on the canal’s throughput. Such faults can be considered as bottlenecks. A bottleneck is a resource whose capacity to provide bandwidth is less than the demand for it. If the level of funding is insufficient or funding is delayed, bottlenecks in the system’s operation are identified in order to eliminate them and improve the performance of the HMS. In addition, the economic efficiency of the measures is determined. In our case, the bottleneck is a section of a linear structure whose capacity is equal to or less than that currently required. The decrease in throughput usually occurs due to a decrease in the canal cross-section due to various reasons. The decision on the method for restoring the functionality of the structures is made after a detailed examination, depending on the type and volume of work, the availability of available equipment and resources, including financial ones. When analyzing a specific facility (Sarpinskaya OOS of the Republic of Kalmykia), it was found that the cost of eliminating bottlenecks is 0.23% of the cost of major repairs. The above works are related to current repairs. Operation of a linear structure after such liquidation is a temporary measure, but it allows for water supply to irrigated areas currently in operation for a limited period prior to repair or reconstruction.
About the Author
V. B. ZhezmerRussian Federation
Valentin B. Zhezmer, candidate of agricultural sciences, leading researcher, head of the laboratory of safety of hydraulic structures irrigation and drainage complex
AuthorID: 897093
44 B. Akademicheskaya str., bldg. 2, Moscow, 127434
References
1. Decree of the President of the Russian Federation of January 30, 2010 No. 120 “On Approval of the Doctrine of food security of the Russian Federation” base.garant.ru›12172719// (accessed 31.05.2023).
2. Federal Law of 21.07.1997 No. 117-FZ (as amended on 08.08.2024) “On the safety of hydraulic structures” (with amendments and additions, effective from 01.09.2024) (accessed 31.01.2025).
3. “GOST 34968-2023 Main pipeline transportation of oil and petroleum products. Engineering Surveys” dated 20.07.2023 (Accessed 22.04.2024).
4. GOST 21-709-2019 Rules for the implementation of working documentation of linear structures of hydro-reclamation systems M. Standartinform. 2020. 24 p. (Accessed 07.03.2025).
5. Rules for the operation of reclamation systems and separately located hydraulic structures” (approved by the Ministry of Agriculture and Food of the Russian Federation on 26.05.1998) Date saved: 13.12.2016 http://www.old.tunadzor.ru›doc/zem/pravila_ekspl.pdf (Accessed 22.04.2024).
6. Goldratt E. Goal. Continuous improvement process. Alpina Digital, Moscow, 2004. 226 p.
7. Federal Law of July 21, 1997 No 117-FZ “On the Safety of Hydraulic Structures” (Collected Legislation of the Russian Federation, 1997, No 30, art. 3589; 2018, No 31, art. 4860) docs.cntd.ru›document/420225740 (accessed 11.07.2024).
8. The Code of Rules “SP 421.1325800.2018. Code of Rules. Reclamation systems and structures. Operating Rules”, approved and put into effect by the order of the Ministry of Construction of Russia dated 24.12.2018 No 854/pr (Moscow: Standartinform, 2019). docs.cntd.ru›document/554403585 (accessed 11.07.2022).
9. Town planning Code of the Russian Federation of December 29, 2004 No 190-FZ (adopted by the State Duma on December 22, 2004).
10. STO 4.2-6-2014. Reclamation systems and structures. Operation. Basic provisions for scheduled preventive maintenance. Novocherkassk, RosNIIPM, 2014.
11. Reclamation systems and structures. RECONSTRUCTION. General requirements. rosniipm.ru›TK151… R_Ameliorative… Interrupted…into…(Accessed 22.04.2023).
12. GOST R70566-2022 Reclamation systems and structures. Rules for inspection and monitoring of technical condition.
13. Order of Rostekhnadzor dated 04.12.2020 No. 497 “On Approval of the Form of the Act of Regular Inspection of Hydraulic Structures (Except for Navigable and Port Hydraulic Structures)” (Registered in the Ministry of Justice of Russia on 18.12.2020 No. 61552).
14. State Estimate Standards. Federal Unit Rates for Construction and Special Construction Works. FER81-02-01-2001. Appendix No 1 to the Order of the Ministry of Construction, Housing and Utilities of the Russian Federation dated December 26, 2019 No 876/pr. minstroyrf.gov. ru›trades/view.fer-2020.php (Accessed 26.04.2024).
15. Ministry of Finance of the Russian Federation. Letter dated 17.10.2017 No 03-03-RZ/67741docs.cntd.ru›document/440597565 (accessed 13.07.2024).
16. Ministerstvo finansov Rossiyskoy Federatsii Departament nalogovoy i tamozhennoy politiki Pis’mo ot 06.10.2017 № 03-03-06/1/65431docs.cntd.ru›document/456097843 (data obrashcheniya 13.07.2024 g.).
17. VNiR. Departmental norms and prices for construction, installation and repair and construction works. Collection B12. Special works in reclamation and water management construction. https://meganorm.ru/mega_doc/norm/vnir_ vedomstvennye-normy-i-rascenki/0/vnir_vedomstvennye_ normy_i_rastsenki_na_stroitelnye_822.html
18. The GRAND-Smeta program is included in the Unified Register of Russian Programs for Electronic Computers and Databases. The entry in the register No11163 dated 07/21/2021 was made on the basis of the order of the Ministry of Digital Development, Communications and Mass Media of the Russian Federation dated 07/21/2021 No750. https://www.grandsmeta.ru/product-grand-smeta (accessed 19.08.2024)
19. Ebrahim Hamid Hussein Al-Qadami a, Abdurrasheed Sa’id Ab-durrasheed Za-hiraniza Mustaffa, Khamaruzaman Wan Yusof M.A. Malek b, Aminuddin Ab Ghani. Numerical modelling of flow characteristics over sharp crested triangular hump. – Results in Engineering, Volume 4, December 2019, 100052 P. 136-142.
20. A. Ferrari, SPH simulation of free surface ow over a sharp-crested weir, Adv. Water Resour. 33 (3) (2010) 270-276.
21. A.S.I. Abdurrasheed K.W. Yusof, H.B. Takaijudin, A. Ab, B.S. Iskandar, Effects of backwater on hydraulic performance evaluation of rainsmart modules in sustainable drainage systems, in: International Conference on Water Resources, Langkawi, Malaysia, November, 2018, pp. 27-28
22. VTR-P-25-80. Departmental Construction Standards. Guidelines for Determining the Permissible Non-Erosion Velocities of Water Flow for Different Soils in Channel Design. Date of introduction 1981-06-01 Approved by the order of the Ministry of Land Reclamation and Water Resources of the USSR on December 4, 1980, N409.
Review
For citations:
Zhezmer V.B. Development of priority measures to increase the capacity of the hydraulic reclamation system, produced before the implementation of major repairs or reconstruction. Prirodoobustrojstvo. 2025;(3):85-92. (In Russ.) https://doi.org/10.26897/1997-6011-2025-3-85-92